src='https://pagead2.googlesyndication.com/pagead/js/adsbygoogle.js?client=ca-pub-2513966551258002'/> Rightways: Apartments Infolinks.com, 2618740 , RESELLER

Pages

Share This

Showing posts with label Apartments. Show all posts
Showing posts with label Apartments. Show all posts

Tuesday, July 2, 2019

Parcel rent bills mailing soon

Stratified property owners given till December 31 to settle dues for 2019

Chow (second right) with (from right) Jagdeep Singh, State Land and Mines office director Akmar Omar and State Secretary Datuk Seri Farizan Darus, showing the new bills for the parcel rent in Komtar, Penang.
OWNERS of stratified properties will now have to pay parcel rent directly to their respective district and land offices.

Chief Minister Chow Kon Yeow said the billing for parcel rent, replacing quit rent, would be sent out to all parcel owners next month through their respective management corporations.

“Previously, it was paid by the respective management corporations of stratified properties.

“Since the bills will be sent out late, parcel owners are given until end of this year to pay up although the deadline is usually May 31 each year,” he told a press conference at Komtar on Friday.

Chow said the parcel rent came into effect since January this year.

He said the rates for parcel rent would be based on the size of each unit, while quit rent was based on the total plot of land which the building was built on.

“Parcel owners will need to update their addresses with the respective district and land offices when paying their parcel rent this year,” he said, adding that the parcel rent billing for next year will be sent to their addresses.

Citing an example, Chow said the total quit rent collected from a specific stratified property last year was RM28,268.

“The collection in parcel rent for the same property will be lesser at RM24,239, as it will not take into account common areas, unlike for quit rent,” he said.

State housing, town, country plan­­ning and local government committee chairman Jagdeep Singh Deo, who was also present, said the arrears for quit rent has amounted to RM65mil to date.

Parcel owners are advised to update their mailing addresses at the land and district office or online at etanah.penang.gov.my

Source link 


Related posts:

Five challenges young Malaysians face with home ownership

 


Resilient values: Geh believes that both landed and high-rise units in prime locations will hold their values. Research house sa..


It’s time for Penang to reinvent itself; RM70bil to be raised from the 3 man-made islands to finance LRT, PIL infrastruture under PTMP




Penang State to study Airbnb woes before legalising operations; Using Airbnb to settle mortgages?

Thursday, February 11, 2016

Developers of toppled Taiwan building detained

Executives face charges over professional negligence resulting in death




Questions are being asked about the building’s construction (Picture: AP)

Three Taiwanese construction company executives have been detained on charges of professional negligence resulting in death following the collapse of an apartment building in an earthquake, killing dozens.

The district prosecutor's office in the city of Tainan said Wednesday that Lin Ming-hui and architects Chang Kui-an and Cheng Chin-kui were suspected of having overseen shoddy construction of the 17-story Weiguan Golden Dragon building, which crashed onto its side during the earthquake Saturday.

It said the three were detained to prevent collusion or other acts that could disrupt the investigation. Among the accusations was that only half as many fasteners had been used in the supporting columns as required.

The death toll in the 6.4-magnitude quake stood at 44 on Wednesday, with all but two of the deaths coming in the building collapse. About 100 people are believed to still be trapped in the debris.

The broadcaster FTV and other Taiwanese media said Lin had changed his name after a previous bankruptcy and had run multiple property development companies in Tainan in an apparent attempt to avoid creditors and bilked clients.

Although the shallow quake was potentially devastating, few buildings were damaged as a result of strict construction standards in force in Taiwan, an island frequently struck by quakes. The Weiguan Golden Dragon building, built in 1989, was the only major structure to collapse in the temblor.

Most of the 320 people who were rescued from the disaster were saved in the hours immediately after the quake, in which the building's foundation and lower floors gave way before it toppled onto its side.

Earthquakes rattle Taiwan frequently. Most are minor and cause little or no damage, but a magnitude-7.6 quake in central Taiwan in 1999 killed more than 2,300 people. More stringent building standards were introduced following that disaster and appear to have been tightly enforced.

The quake struck during the most important family holiday in the Chinese calendar - the Lunar New Year. Celebrations of the holiday in Taiwan have been subdued. - AP

Related posts:


 Hills clearing in Penang: NGOs not impressed with mitigation work at Botak Hill 

 Penang Forum tells Chief Minister: the unmitigated diasters on hill projects