src='https://pagead2.googlesyndication.com/pagead/js/adsbygoogle.js?client=ca-pub-2513966551258002'/> Rightways: developers Infolinks.com, 2618740 , RESELLER

Pages

Share This

Showing posts with label developers. Show all posts
Showing posts with label developers. Show all posts

Thursday, February 11, 2016

Developers of toppled Taiwan building detained

Executives face charges over professional negligence resulting in death




Questions are being asked about the building’s construction (Picture: AP)

Three Taiwanese construction company executives have been detained on charges of professional negligence resulting in death following the collapse of an apartment building in an earthquake, killing dozens.

The district prosecutor's office in the city of Tainan said Wednesday that Lin Ming-hui and architects Chang Kui-an and Cheng Chin-kui were suspected of having overseen shoddy construction of the 17-story Weiguan Golden Dragon building, which crashed onto its side during the earthquake Saturday.

It said the three were detained to prevent collusion or other acts that could disrupt the investigation. Among the accusations was that only half as many fasteners had been used in the supporting columns as required.

The death toll in the 6.4-magnitude quake stood at 44 on Wednesday, with all but two of the deaths coming in the building collapse. About 100 people are believed to still be trapped in the debris.

The broadcaster FTV and other Taiwanese media said Lin had changed his name after a previous bankruptcy and had run multiple property development companies in Tainan in an apparent attempt to avoid creditors and bilked clients.

Although the shallow quake was potentially devastating, few buildings were damaged as a result of strict construction standards in force in Taiwan, an island frequently struck by quakes. The Weiguan Golden Dragon building, built in 1989, was the only major structure to collapse in the temblor.

Most of the 320 people who were rescued from the disaster were saved in the hours immediately after the quake, in which the building's foundation and lower floors gave way before it toppled onto its side.

Earthquakes rattle Taiwan frequently. Most are minor and cause little or no damage, but a magnitude-7.6 quake in central Taiwan in 1999 killed more than 2,300 people. More stringent building standards were introduced following that disaster and appear to have been tightly enforced.

The quake struck during the most important family holiday in the Chinese calendar - the Lunar New Year. Celebrations of the holiday in Taiwan have been subdued. - AP

Related posts:


 Hills clearing in Penang: NGOs not impressed with mitigation work at Botak Hill 

 Penang Forum tells Chief Minister: the unmitigated diasters on hill projects


Thursday, January 28, 2016

Hills clearing in Penang: NGOs not impressed with mitigation work at Botak Hill


http://www.thestar.com.my/metro/community/2016/01/28/searing-queries-on-clearing-ngos-not-impressed-with-mitigation-work-at-botak-hill/
An aerial shot taken from the bald patch on Bukit Relau, George Town, during a visit by the state delegation and NGOs to check on the mitigation work. — Photos: CHARLES MARIASOOSAY.

Chow (left) being briefed by technical consultant Khoo Koon Tai during the visit up Bukit Relau.

THE climb up the steep track on Bukit Relau is an arduous one. And there is little reward now for those who endure the climb.

The infamous Botak Hill seems to be getting balder. It’s a sad sight. What was once a lush hill had become a wide open patch of brown. Now, it is a giant scar of boulder, sand and concrete. The developer General Accomplish-ment Sdn Bhd is carrying out mitigation work which it says will be completed in June this year. For now, however, the hill looks worse than it did before.

The trip up the hill was arranged by the state and led by Local Government Committee chairman Chow Kon Yeow. Others in the entourage included Deputy Chief Minister 1, Datuk Mohd Rashid Hasnon, executive councillors, state assemblyman, Penang Forum and Malaysia Nature Society, Penang.

It was no surprise that the NGO members were not impressed with the mitigation work. The condition of the hill has deteriorated so badly. The only greenery in sight were patches of grass on the boulders.

The NGOs are even more upset that with less than six months before the mitigation work is completed, there seems to be no plan in place to halt the erosion of the hill or to carry out restoration work, which will have to include replanting of trees, the undergrowth and comprehensive hydroseeding.

Roads and drainage systems built right down the hill have destroyed whatever greenery there was. The explanation given was that the roads were needed for the mitigation work rings hollow. “How can you carry out mitigation work and clear more land for the so called roads for mitigation work,” asked a Penang Forum member.

There are metal poles bordering a part of the hill, and it look like some hoarding is about to come up. Is there any development being planned for the spot of the hill?

A spokesman for the developer, General Accomplishment Sdn Bhd said RM20mil has been spent so far for the mitigation work and the amount could rise to RM50mil.

“Why would you want to spend RM50mil for mitigation work if you are not going to do anything with the land,” asked a reporter.

“Well, we are open to development of the land if that is what the people want,” replied the project manager for the developer.

Chow was non-committal when asked if the state would reject any development on the land saying it was a “hypothetical” question as there wasn’t any application (to develop the land).

Despite the long explanation, the burning question remains.

Will the hill be restored to its old state and or is the mitigation work just the start of plans to develop the hill for housing.

It was rezoned for housing in 2012.

By K. Sekaran The Star

Related posts:




The Penang Forum steering committee released the following ‘executive summary’ to the media during its meeting with the chief minister of P...

Dec 13, 2015 ... Dr Kam was delivering a talk titled, 'What is happening to our hills' at the Save The Hills of Penang public forum at Dewan Sri Pinang here ...
Dec 11, 2015 ... The spate of hill clearings has prompted the Penang Forum, a coalition of public interest NGOs, to hold a forum on Save the Hills of Penang ...

Thursday, January 14, 2016

Penang Forum tells Chief Minister: the unmitigated disasters on hill projects

The Penang Forum steering committee released the following ‘executive summary’ to the media during its meeting with the chief minister of Penang

The Penang Forum steering committee released the following ‘executive summary’ to the media during its meeting with the chief minister of Penang:

To address public concerns over hill degradation in Penang, the Penang Forum took the initiative in September 2015 to co-organise a public forum on hill development with the MBPP and relevant Penang state authorities.

But the council and the state decided not to participate in the effort and missed the opportunity to engage with the public.

In organising the public forum, the Penang Forum is non-partisan and has not been influenced by any other body or organisation.

The Penang Forum has not been misinformed. Its information and data came from two sources:
  • answers provided by the State Exco to the State Assembly sitting in November 2015 on the number of legal projects and illegal clearings on sensitive hill land between 2008 and 2015; and 
  • photographs provided by members of public, resident associations, Google Earth satellite imagery and drone shots. The scarring on Bukit Relau has grown into an unmitigated disaster. Despite a stop work order and a fine against those responsible, major earthworks, including the building of road infrastructure, have taken place.
 While it is technically possible to build safely on hill slopes many stringent conditions must first be in place and complied with. The present approach to environmental and engineering impact assessment done in isolation for individual hill development projects should be reviewed.

The Penang Forum calls on the Penang state government to comply with its own stated policies of prohibiting development on hill land above 76m (250 feet) and/or with a gradient greater than 25 degrees.

Special projects should be limited only to those of public interest.

We recommend that the authorities implement a holistic planning and monitoring system that takes account of cumulative impacts for the whole hill area under development.

We call for violators to be prosecuted to the full extent of the law, including jail sentences and to be blacklisted for future projects.

We call upon the authorities to require all offenders to restore the damaged hills to their original condition.

Penang Forum steering committee 11 January 2016

Related:

Penang Forum | Towards local democracy and sustainable ...


Related posts:

Dec 13, 2015 ... Dr Kam was delivering a talk titled, 'What is happening to our hills' at the Save The Hills of Penang public forum at Dewan Sri Pinang here ...

Dec 11, 2015 ... The spate of hill clearings has prompted the Penang Forum, a coalition of public interest NGOs, to hold a forum on Save the Hills of Penang ...